風電基礎鋼模板-混凝土風電基礎模板-簡單介紹是模板在進行制作時,所應用的制作步驟以及其他方面都需要多加的注意,模板的加工步驟簡單,在制作的過程中需要注意的是對模板的應用,模板在加工的過程中需要把模板還有一些加工工具們全部都帶到使用場地中,然后再開始進行使用,模板的加工步驟簡單。
Wind power foundation steel formwork - concrete wind power foundation Formwork - a brief introduction is that the manufacturing steps and other aspects of the formwork need to be paid more attention. The processing steps of the formwork are simple. During the manufacturing process, attention should be paid to the application of the formwork. During the processing of the formwork, the formwork and some processing tools need to be brought to the use site, and then they can be used, The processing steps of the template are simple.
在進行操作的流程中,所應用到的加工人員非常的少,整體的制作環節中需要減少模板出現受損的現象,以免模板的應用次數受到很大的使用影響,風電基礎鋼模板壽命是很長,應用的時間基本在3年左右,模板加工出來的風電基礎的表面非常的光滑,在制作的流程中是先把模板的大基礎制作出來以后。
In the process of operation, very few processing personnel are applied. In the overall manufacturing process, it is necessary to reduce the damage of the template to avoid the great impact on the application times of the template. The service life of the wind power foundation steel template is very long, and the application time is basically about 3 years. The surface of the wind power foundation processed by the template is very smooth. In the manufacturing process, the large foundation of the template is made first.
然后再制作模板的小基礎,模板加工風電基礎的步驟中需要把模板的大基礎加工出來以后,然后再在模板的中心位置應用風電基礎鋼模板來組裝好用同樣的方法來加工小基礎,模板在應用的過程中需要避免施工現場有雜物,否則會對模板的應用時間造成很大的影響,應用的次數就會減少了。
Then make the small foundation of the formwork. After the large foundation of the formwork is processed in the process of processing the wind power foundation, the wind power foundation steel formwork is applied in the center of the formwork to assemble and process the small foundation in the same way. During the application of the formwork, it is necessary to avoid sundries on the construction site, otherwise it will have a great impact on the application time of the formwork, and the application times will be reduced.
風能基礎形狀的基礎知識與大型風電場的安裝有著千絲萬縷的聯系。由于任何風力渦輪機的葉片和支架都很大,因此地面需要一個大地基來支撐它們。因此,根據具體的設計標準,風電場基礎的直徑是不同的。
The basic knowledge of the basic shape of wind energy is inextricably linked with the installation of large wind farms. Since the blades and supports of any wind turbine are large, the ground needs a foundation to support them. Therefore, the diameter of wind farm foundation is different according to specific design standards.
風力發電的基本形狀的重要性在于,風力發電機離不開它,并且高度和厚度會發生變化,因此它們的尺寸是可變的。風力渦輪機基礎模具可以成排組裝并在系列鑄造后立即鑄造。它們具有無需運輸、效率更高、耐用性更強的特點。它們廣泛用于風力渦輪機的建造。使用模具時,必須按照模具組裝、脫模、混凝土澆注、板材振動、脫模的順序進行。
The importance of the basic shape of wind power generation is that wind turbines cannot be separated from it, and their height and thickness will change, so their size is variable. Wind turbine foundation molds can be assembled in rows and cast immediately after series casting. They have the characteristics of no transportation, higher efficiency and stronger durability. They are widely used in the construction of wind turbines. When using the mold, it must be carried out in the order of mold assembly, demoulding, concrete pouring, plate vibration and demoulding.
請注意,用于澆筑的混凝土用量較大,需提前按所需強度科學分配,并用混凝土攪拌機攪拌均勻。一旦模具均勻地涂上脫模劑,就可以直接注射了。在此過程中,可能混凝土中的砂石較多,含水量不足,導致流動性差。在這種情況下,可以進行手動協調,并可以使用鏟子將混凝土均勻分布。一般在澆筑完成后,待混凝土基本硬化,鋼模與風電底座鋼模分離后即可獨立成型,再取出模具進行下一步生產。
Please note that the amount of concrete used for pouring is large, so it needs to be scientifically distributed in advance according to the required strength and mixed evenly with a concrete mixer. Once the mold is evenly coated with release agent, it can be directly injected. In this process, there may be more sand and gravel in the concrete, and the water content is insufficient, resulting in poor fluidity. In this case, manual coordination can be carried out and the concrete can be evenly distributed with a shovel. Generally, after the pouring is completed, after the concrete is basically hardened and the steel formwork of the wind power base is separated, it can be formed independently, and then the formwork can be taken out for the next step of production.